Client: Department of Environment
Project Solution
This impressive 6500 sq meter building on a 2-hectare site benefits from 2 Faac B680 top of the range barriers integrated with access control to regulate vehicle movement. A set of Faac interlocking doors are installed at the front lobby to eradicate risk of doors slamming shut due to wind shear as a result of the sites elevated location.
Services provided
Consultancy, design, installation, commissioning, ongoing service maintenance, CCTV, Intercoms, access control, Intruder alarm and 24/7 monitoring.